Oil & Gas Production

We have extensive experience in creating high fidelity dynamic simulations within the Industry.

Oil and Gas platform_Sectors

How we can help

We have created many Operator Training Simulations of Upstream Offshore and Onshore assets globally over the last 40 years including many of BP’s assets on the Caspian Sea.

Full thermodynamic and multi-component modelling methods allows TSC’s dynamic simulation engine to produce accurate transient responses for many parts of the Oil and Gas production units.

Our ability to create our own simulations means that our solutions are suitable for engineering, training and competence assurance.

Simulation Models Available

We have a a range of classroom simulations specifically designed for the use of training and assessment for both traines’s and students

To view our 3D Interactive Virtual Plant range click here

 

IVP Models

3D SIM 8000 Three Phase separator

3D SIM 8010 Centrifugal Compressor

3D SIM 8020 Condensate Tank Farm

3D SIM 8030 Liquid Pipeline with Pigging

SIM 1100 Bath Time

SIM 1110 Pumped Tanks

SIM 1120 Gas Separator

SIM 1121 Gas Separator with Level Control

SIM 1140 Valve Characteristics

SIM 2100 Level Control Combined

SIM 2101 Level Control- Feed Back

SIM 2102 Level Control- Cascade

SIM 2103 Level Control – Gap

SIM 2104 Level Control- Feed Forward

SIM 2105 Level Control- Feed Forward & Back

SIM 2106 Level Control – Ratio

SIM 2107 Level Control- Ratio & Cascade

SIM 2108 Level Control- Selective

SIM 2109 Level Control- Split Range

SIM 2200 Pressure Control- Combined

SIM 2201 Pressure Control- Feed Back

SIM 2202 Pressure Control- Cascade

SIM 2203 Pressure Control- Gap

SIM 2204 Pressure Control- Feed Forward

SIM 2205 Pressure Control- Feed Forward & Back

SIM 2206 Pressure Control- Ratio

SIM 2207 Pressure Control- Ratio & Cascade

SIM 2208 Pressure Control- Selective

SIM 2209 Pressure Control- Split Range

SIM 2301 Temperature Control- Feed Back

SIM 3010 Drained Tanks

SIM 3100 Two Phase Separator

SIM 3101 Two Phase Separator with Flow Control

SIM 3110 Three Phase Separator

SIM 3120 Vessel with Nitrogen Blanket

SIM 3200 Condenser

SIM 3210 Evaporator

SIM 3220 Shell & Tube Heat Exchanger

SIM 3221 Shell & Tube Heat Exchanger- Feed Back

SIM 3222 Shell & Tube Heat Exchanger- Ratio & Cascade

SIM 3230 Crude Oil Furnace

SIM 3240 Simple Desalination

SIM 3300 Centrifugal Compressor

SIM 3301 Centrifugal Compressor- Fixed Speed

SIM 3302 Centrifugal Compressor- Variable Speed

SIM 3303 Centrifugal Compressor- Pipeline

SIM 3304 Centrifugal Compressor- Two Stage

SIM 3305 Centrifugal Compressor – Lube & Seal Oil

SIM 3310 Reciprocating Compressor

SIM 3320 Centrifugal Pump

SIM 3330 Reciprocating Pump

SIM 3340 Gas Turbine

SIM 3400 Binary Column

SIM 3410 Absorption Column

SIM 4110 Separation Train

SIM 4120 Gas Fired Boiler

SIM 4200 Amine System

SIM 4210 TEG Gas Dehydration

SIM 4300 Crude Distillation Unit

SIM 4310 Fractionation Train

SIM 4320 Vacuum Column

SIM 4400 Refrigeration System

SIM 4500 Advanced Reactor- Combined

SIM 4501 Advanced Reactor- Batch

SIM 4502 Advanced Reactor- CSTR

SIM 4600 Oil Pipeline

SIM 4610 Wellheads & Risers

SIM 4730 Fluidised Catalytic Cracker

SIM 5100 Offshore Oil & Gas Platform

SIM 5120 LNG Production Unit

SIM 5200 Tank Farm

SIM 5410 Onshore MEM Simulation

SIM 5675 Oil Production, Storage & Distribution

More To Explore

Interactive Virtual Plant

Operator Training Simulators

Major Emergency Management

Contact us. get in touch. Careers

Speak To Our Team Today

Want to know more about how our products can help you, or want to request a demo? contact us today.