LNG Production & Gas Transmission

Operator Training models for LNG Production and Gas Transmission.

LNG Tanker_Sectors

Validation & Training Models

We have a long history in both gas storage, gas transmission and LNG liquefaction and re-gasification.

We have provided validation studies for over half of all the UK National Gas Transmissions Network compressor stations and many of the gas storage caverns.

Gas processing for LNG liquefaction has been modelled to optimise the processes at UK LNG storage sites.

Full dynamic models have been generated for LNG ship unloading, both in generic form for training and in connection with a validation study for the UK Teesside Gasport Terminal. Operator Training models for LNG production have been supplied

Simulation Models Available

We have a a range of classroom simulations specifically designed for the use of training and assessment for both traines’s and students

To view our 3D Interactive Virtual Plant range click here

 

IVP Models

SIM 5120 LNG Production

3D SIM 8010 Centrifugal Compressor

3D SIM 8030 Liquid Pipeline with Pigging

SIM 1100 Bathtime

SIM 1110 Pumped Tanks

SIM 1120 Gas Separator

SIM 1121 Gas Separator with Level Control

SIM 1140 Valve Characteristics

SIM 2100 Level control- Combined

SIM 2101 Level Control- Feedback

SIM 2102 Level Control- Cascade

SIM 2103 Level Control- Gap

SIM 2104 Level Control- Feed Forward

SIM 2105 Level Control Feed Forward & Back

SIM 2106 Level Control- Ratio

SIM 2107 Level Control- Ratio & Cascade

SIM 2108 Level Control- Selective

SIM 2109 Level Control- Split Range

SIM 2200 Pressure Control- Combined

SIM 2201 Pressure Control- Feed Back

SIM 2202 Pressure Control- Cascade

SIM 2203 Pressure Control- Gap

SIM 2204 Pressure Control- Feed Forward

SIM 2205 Pressure Control- Feed Forward & Back

SIM 2206 Pressure Control- Ratio

SIM 2207 Pressure Control- Ratio & Cascade

SIM 2208 Pressure Control- Selective

SIM 2209 Pressure Control- Split Range

SIM 2301 Temperature Control- Feed Back

SIM 3010 Drained Tanks

SIM 3100 Two Phase Separator

SIM 3101 Two Phase Separator with Flow Control

SIM 3110 Three Phase Separator

SIM 3120 Vessel with Nitrogen Blanket

SIM 3200 Condenser

SIM 3210 Evaporator

SIM 3220 Shell & Tube Heat Exchanger

SIM 3221 Shell & Tube Heat Exchanger- Feed Back

SIM 3222 Shell & Tube Heat Exchanger- Ratio & Cascade

SIM 3240 Simple Desalination

SIM 3300 Centrifugal Compressor

SIM 3301 Centrifugal Compressor- Fixed Speed

SIM 3302 Centrifugal Compressor- Variable Speed

SIM 3303 Centrifugal Compressor- Pipeline

SIM 3304 Centrifugal Compressor- Two Stage

SIM 3305 Centrifugal Compressor- Lube & Seal Oil

SIM 3310 Reciprocating Compressor

SIM 3320 Centrifugal Pump

SIM 3330 Reciprocating Pump

SIM 3340 Gas Turbine

SIM 4110 Separation Train

SIM 4120 Gas Fired Boiler

SIM 4200 Amine System

SIM 4210 TEG Gas Dehydration

SIM 4310 Fractionation Train

SIM 4400 Refrigeration System

SIM 5120 LNG Production

SIM 5200 Tank Farm

More To Explore

Virtual Environments & Digital Twin

Engineering Services

Classroom Simulation

Contact us. get in touch. Careers

Speak To Our Team Today

Want to know more about how our products can help you, or want to request a demo? contact us today.