SIM 5120 LNG Production

SIM 5120 LNG Production Reformer Unit

SIM 5120 LNG Production

SIM 5100 LNG Processing model covers all aspects of the cryogenic refrigeration of natural gas from the input of 2 phase flow to the storage and export of LNG, including gas cleaning, propane and multi-component refrigeration.

 

About the sim

Model Description

This model can be used for all levels of training in LNG production operations from learning the basics of CO2 removal with Amine and preparing loading arms to fill tankers through to the operation of a cryogenic heat exchanger and heat removal using both propane and multi-component compression and expansion.

This model contains a cold start, in which the model is in a shutdown state and ready for the user to attempt a full start-up. Also included is a general procedure that can be followed to take the plant from a shutdown state to fully operating and producing LNG. Each major process page contains a help file describing what is happening in the selected section.

Explore More Simulations

SIM 5100

SIM 5675 Oil Production, S&D

3D Three Phase Separator

Contact us. get in touch. Careers

Speak to our team today

Want to know more about how our products can help you, or want to request a demo? Contact us today.