Use the investment of a TSC Operator Training Simulator to improve the entire development of a project.
Live Processes in Process plants are fast, interactive, hazardous, and continuous, making it difficult to train operators to make good decisions. The same challenges make it hard to test changes and design processes that are necessary to deliver improved performances
These difficulties can create performance roadblock and hinder industries who strive to run plants effectively without compromising on safety.
A Life Cycle Simulator (LCS) or Multi-Purpose Dynamic Simulator (MPDS) is a concept that that can simulate the dynamic behaviour of a process plant over its entire life cycle. This includes the design, construction, operation, maintenance, and decommissioning phases. By simulating the process under different operating conditions and scenarios, LCS can be used to optimize the performance of a process and identify areas for improvement.
Advantages of using a life cycle simulator approach include:
- Reduced capital costs through less re-engineering of both equipment and control systems
- Faster process initial start-up through less commissioning issues and better trained operators.
- Operators trained faster and have in depth knowledge of the system before start-up.
- Emergency responses verified and trained on optimised process.
- Improved safety and reduced risk.
- Reduced Commissioning time and costs from a pre-tested simulation model in the design phases.
Visit our Multi Purpose Dynamic Simulator page for more details